

Skeletal chassis are the lightest way to move containers: no deck, no side walls, just the frame, twist locks and a bogie. Lower tare weight converts directly into payload on every trip, which is why port drayage fleets standardise on them.
Typical duty cycles for this range. Matching the structure and running gear to the actual cycle is what separates a trailer that lasts fifteen years from one that cracks in three:
Core structure: High-tensile steel main frame with 12 twist locks for 20ft/40ft/45ft boxes.
Configuration options: Fixed or gooseneck chassis, sliding bogie optional for axle-load compliance.
Axle spacing and tyre size are selected against the destination market's limits before steel is cut: SADC corridors at 56 t GCM, CEMAC at 50 t, ECOWAS at 51 t and the East African Community at 56 t. Each regime caps individual axle loads differently, so the same trailer may need a different bogie setting for a different corridor. We include the calculation with the quotation.
Standard export method: Break-bulk nested, or 40ft Flat Rack; several units can be stacked for efficiency. Loading plans, lashing points and a stowage diagram are supplied with each shipment so the terminal can handle the unit without improvisation.
Orders move through drawing approval, steel fabrication, painting and pre-shipment inspection. Each unit ships with an inspection report, a first-year consumable kit and a maintenance schedule in English or French. On arrival our engineers support commissioning by video call.
Q1: How do I confirm the right specification for my route?
A: Send us your legal axle-load limits, the cargo you carry most often and the typical road surface. We return a specification sheet with beam section, deck plate thickness, axle rating and body geometry matched to those inputs, together with a layout drawing for approval before production starts.
Q2: What is the production and delivery lead time?
A: Standard trailers are built in 20 to 30 working days; custom body work adds 5 to 10 days. Ocean transit to Lagos, Mombasa, Dar es Salaam, Douala or Abidjan usually takes 25 to 40 days, plus local clearance time.
Q3: What warranty and parts support comes with the unit?
A: Every unit ships with a 12-month or 50,000 km structural and component warranty, a first-year consumable kit, and a parts catalogue in English or French so your workshop can order by part number without waiting for translation.
Need a Drawing and Quotation for This Range? Request Layout Drawing & Factory Quote |