Dump Truck

Dump Truck

Shacman tippers suit hard-rock quarries and iron-ore pits where the body takes direct impact from large rubble. The straight-frame chassis and short wheelbase reduce frame flex under asymmetric loading, which is the main cause of tipper body cracking.

1. Application & Duty Matching

This range is normally deployed in the following duty cycles. Matching the body, cooling package and axle ratio to the actual cycle is what determines service life in African conditions:

  • Hard rock quarry loading
  • Iron ore and manganese haulage
  • Overburden stripping
  • Aggregate delivery to batching plants

2. Powertrain & Configuration

Core driveline: Weichai WP12 engines with heavy-duty radiators and oil coolers for sustained climbing.

Body and equipment options: Hardox 450 lined tipper bodies with reinforced tailgates and impact-absorbing floor ribs.

3. Regional Axle-Load & Compliance

Every export configuration is matched to the destination market's legal limits before the chassis is built. SADC corridors operate at 56 t gross combination mass, CEMAC at 50 t, ECOWAS at 51 t, and the East African Community at 56 t — but each agreement caps individual axle loads differently. We provide the axle-rating calculation with the quotation so the combination stays legal at every weighbridge on the route, not just at the port of entry.

4. Shipping & Port Delivery

Standard export method: Break-bulk or Ro-Ro; the hoist is pinned and the body blocked for ocean transit. We supply the loading plan, lashing points and drain/isolation checklist with every shipment so terminal inspection passes without delay.

5. Ordering & Commissioning

Orders move through four stages: specification sign-off, chassis build, body fabrication and pre-shipment inspection. Each unit ships with a pre-delivery inspection report, a first-year spare parts kit and an operator handbook in English or French. On arrival our engineering team supports commissioning by video call while your mechanic performs the first service, which keeps the warranty valid without waiting for a factory technician to travel.

6. Sourcing FAQ

Q1: Which configuration suits our road and load conditions?

A: The right specification depends on your legal gross combination weight, typical gradient and road surface. Send us your route profile and payload target and our engineering team will return a configuration sheet with axle ratings, tyre size and body thickness matched to those conditions.

Q2: How long is production and shipping to an African port?

A: Standard units are built in 25 to 35 working days depending on body type and options. Ocean transit to Lagos, Mombasa, Dar es Salaam, Douala or Abidjan typically adds 25 to 40 days, plus 5 to 10 working days for customs clearance at destination.

Q3: What spare parts support is available after delivery?

A: We supply a recommended first-year spare parts kit with every unit and can ship consumables by air within 7 days. Common wear items for this range are held in regional stock so fleets are not idled waiting on imports.

Need a Specification Sheet for This Range?

Request Factory Quote & Technical Datasheet
  • 1