



Pneumatic bulk cement trailers discharge powder using compressed air and a fluidised bed, so the design of the aeration system matters far more than tank volume. A poorly matched compressor leaves 5-10 percent of the load stuck in the tank at every delivery.
Typical duty cycles for this range. Matching the structure and running gear to the actual cycle is what separates a trailer that lasts fifteen years from one that cracks in three:
Core structure: V-shape or W-shape (banana) tank with fluidisation air pads and a dedicated compressor.
Configuration options: Single or multiple compartments, 30-50 m3 capacity, bottom or top discharge.
Axle spacing and tyre size are selected against the destination market's limits before steel is cut: SADC corridors at 56 t GCM, CEMAC at 50 t, ECOWAS at 51 t and the East African Community at 56 t. Each regime caps individual axle loads differently, so the same trailer may need a different bogie setting for a different corridor. We include the calculation with the quotation.
Standard export method: Break-bulk on deck or Ro-Ro; tanks are shipped clean, dry and pressure-tested. Loading plans, lashing points and a stowage diagram are supplied with each shipment so the terminal can handle the unit without improvisation.
Orders move through drawing approval, steel fabrication, painting and pre-shipment inspection. Each unit ships with an inspection report, a first-year consumable kit and a maintenance schedule in English or French. On arrival our engineers support commissioning by video call.
Q1: How do I confirm the right specification for my route?
A: Send us your legal axle-load limits, the cargo you carry most often and the typical road surface. We return a specification sheet with beam section, deck plate thickness, axle rating and body geometry matched to those inputs, together with a layout drawing for approval before production starts.
Q2: What is the production and delivery lead time?
A: Standard trailers are built in 20 to 30 working days; custom body work adds 5 to 10 days. Ocean transit to Lagos, Mombasa, Dar es Salaam, Douala or Abidjan usually takes 25 to 40 days, plus local clearance time.
Q3: What warranty and parts support comes with the unit?
A: Every unit ships with a 12-month or 50,000 km structural and component warranty, a first-year consumable kit, and a parts catalogue in English or French so your workshop can order by part number without waiting for translation.
Need a Drawing and Quotation for This Range? Request Layout Drawing & Factory Quote |